Apartments

Structure:
- Cement and concrete reinforcement.
- Closing made up of exterior
fabric perforated bricks, air chamber with polythyrene foam, brick
partition in the
inner face.
Roof:
- Inclined roofing tiles with insulation.
- The terraces
are sealed with asphalt sheet, thermically isolated with injected
polythyrene foam.
Exterior Finishing:
- The front will be finished in medium cement mortar and painted
to the specifications of the Architect.
Floors:
- Ceramic tiling throughout the dwelling.
- Vertical Specifications:
- Rooms: Protective plaster with insertion.
- Kitchen, bathrooms:
Tiled with ceramic pieces, border, either with molding or decoration.
Ceilings:
- Plaster board in kitchens, bathrooms and wherever necessary
to cover cabling.
- Interior carpentry:
- Reinforced front security door finished
in varnished wood, with security locks and peep hole.
- Interior doors with molded sheets
in model “construction”.
• Glass kitchen and lounge doors of the same characteristics of
the previous line of “construction”.
- Varnished
fitted wardrobes with the model “construction”.
Exterior
carpentry:
- Aluminium carpentry painted in the colour specified by your
Architect.
- PVC roller blinds in the bedrooms and lounge integrated
in the carpentry in a compact system.
- Windows with double glazing
of type ´Climalite´ or
similar.
- Sanitary apparatus:
- Bathroom finished in crystal porcelain
chosen by the architect, of model ROCA or similar.
- Single chrome tap of model “ROCA” or
similar.
Paint:
- Plastic paint on vertical specifications to be chosen by
architect.
- Plastic paint used on all the ceilings in the house.
- All
wooden carpentry varnished.
Plumbing:
- Finished in copper tubing. The waste pipes installed with
PVC.
- Pipes installed for water and waste for washing machine
and dish washer.
- Keys to cut the water supply in all of the rooms
that have water connection.
- Production of hot water using an individual
gas water meter.
Electricity:
- Electric installation registered according
to Spanish law.
- Telecommunication installations with TV and telephone, using
normal forms of telecommunication with a number
of outlets, typical for a house with a minimum of two.
Gas:
- Installation of gas location for the production of sanitary
hot water (optional for central heating and kitchen).
Air conditioning:
- Pre-installation of air-conditioning in dining room and
main bedroom.
* NOTE: Spanish Sol-utions have translated this from the original
Spanish specifications document. Spanish Sol-utions accept no
responsibility for this translation, subject to contract.